Sylhet Correspondent :
At last, the much talked about bridge over the river Surma at Kazirbazar in the Sylhet city is going to be opened formally on October 8.
The Prime Minister is scheduled to formally inaugurate it, along with another important road development project worth Tk 4415.3 million in Sylhet through video conferencing, official sources informed this afternoon. A programme is being arranged at the Deputy Commissioner’s conference room in this connection.
R & H has been implementing the 4-lane 391 metre by 18.5 metre bridge, worth Tk 1450 million. However, it was revised thrice since the foundation was laid in 2005 by the then finance minister M Saifur Rahman.
Although Tk 360 million was targeted expenditure at the beginning, now it is Tk 1450 million with several changes in its original alignment and design.
At last, the much talked about bridge over the river Surma at Kazirbazar in the Sylhet city is going to be opened formally on October 8.
The Prime Minister is scheduled to formally inaugurate it, along with another important road development project worth Tk 4415.3 million in Sylhet through video conferencing, official sources informed this afternoon. A programme is being arranged at the Deputy Commissioner’s conference room in this connection.
R & H has been implementing the 4-lane 391 metre by 18.5 metre bridge, worth Tk 1450 million. However, it was revised thrice since the foundation was laid in 2005 by the then finance minister M Saifur Rahman.
Although Tk 360 million was targeted expenditure at the beginning, now it is Tk 1450 million with several changes in its original alignment and design.