Chattogram Bureau :
Six broad gauge locomotives (engines) of the first shipment of Bangladesh Railway have arrived at Chittagong port from the United States.
The unloading of the train’s engine at the port’s berth began on Saturday (March 6) morning. Chief Mechanical Engineer of the Eastern Railway Borhan Uddin told the media that 40 broad gauge locomotives are being brought from the United States.
These will come to the port in 5 steps. 6 came in the first step.
He said the broad gauge locomotives were being carefully unloaded from the ship with the help of cranes.